È«¹úÃâ·Ñ·þÎñÈÈÏߣº4009-626-110
ÒµÎñ×ÉѯרÏߣº139-2526-3101Ì·
|
½ð±¦ÐÅLEDÊÒÄÚÍâ×âÁÞÆÁ°²×°ËµÃ÷LED×âÁÞÆÁ°²×°ËµÃ÷
1£¬¼ì²éµ¥¸öÆÁÌåµÄµ¥ÔªÏäÌåÊýÁ¿£¬ÈÕ×Ӽܡ¢Á¬½ÓƬ£¬Ï߲ģ¬ÂÝË¿ÊýÁ¿ºÍ³ß´çÊÇ·ñ·ûºÏÆÁÌåÒªÇ󣨱¾ÆÁΪP2.604ÆÁ£¬500*500*65mmÏäÌå5*5¸öÆ´½Ó£©£¬ÓÃ1+1.5Ã×ÈÕ×Ó¼Ü4Ì×£¬Á¬½ÓƬ32¸ö£¬Á¬½ÓƬÂÝË¿128¸ö£¬ÏäÌåÖ®¼äµçÔ´Ïß75cm25Ìõ£¬ÍøÏß75cm25Ìõ£¬3ÌõÖ÷µçÔ´Ïߣ¬2ÌõÖ÷ÍøÏߣ¬Ã¿ÌõÖ÷µçÔ´Ïß´ø8-10¸öÏäÌ壬ÿÌõÖ÷ÍøÏß´ø8-10¸öÏäÌå¡£ 2£¬ÆÁÌ寴װ£¬×°ÆÁ֮ǰÏȽ«Ã¿¸öÏäÌåµãÁÁ²âÊÔûÎÊÌâÔÚÍùÉÏ×°£¬ÏȽ«µÚÒ»ÅÅ5¸öÏäÌå×óÓÒÓÃËø¿ÛËø½ô£¬È»ºóºóÅÅÿ¸ôÒ»¸öÏäÌå¹Ì¶¨Ò»¸ö1.5Ã×ÈÕ×Ӽܣ¬×°ºÃÓëҪʹÓõĵط½£¬µÚÒ»Åŵ÷ˮƽ£¬ºóÃæÓÃÁ¬½ÓƬºÍÂÝË¿½«ÏäÌåÓÚÈÕ×Ӽ̶ܹ¨£¬È»ºó×°µÚ¶þÅÅÏäÌ壬ÿ¸ôÏäÌå×óÓÒËø½ô£¬ÓëÏÂÅÅÏäÌåÒ²ÓÃËø¿ÛËø½ô£¬Ò»´ÎÀàÍÆ×°ºÃ3ÅÅ£¬È»ºó½«1Ã×ÈÕ×Ó¼ÜÓÚ1.5Ã×ÈÕ×Ó¼ÜÁ¬½ÓºÃ£¬ÔÚ×°ÉÏÃæÁ½ÅÅÏäÌå¡£ 3£¬ÆÁÌå½ÓÏߣ¬ÏäÌåÖ®¼äµçÔ´ÏßÁ¬½Ó°´Ï߲ĺÍÏäÌå±ê×¢·ûºÅ²åÏߣ¬ÍøÏßÒ²Ààͬ£¬ÕûÆÁÿÁ½ºáÅÅÓÃ1ÌõÖ÷µçÔ´ÏߺÍ1ÌõÖ÷ÍøÏߣ¬×îÉÏÃæÒ»ÅÅÓÃÒ»ÌõÖ÷µçÔ´ÏߺÍÖ÷ÍøÏß¡£ 4£¬Í¨µçµ÷ÊÔ£¬Í¨µç֮ǰÏȼì²éÆÁÌåÏß·ÊÇ·ñ½Ó´í£¬È·ÈÏÍêÎÞÎóÈ»ºóͨµç£¬Á¬½ÓµçÄÔ£¬ÔÚµçÄÔÉÏ×öºÃÆÁÌå³ÌÐò£¬È»ºó·¢Ë͵½ÆÁÌåÉÏÃæ¡£ 5£¬ÆÁÌåʹÓ㬾ßÌåÄÚÈݲÙ×÷·¢²¼Çë²ÎÕ¹AppʹÓÃ˵Ã÷¡£
LED rental screen installation instructions 1, check the number of unit housing a single screen, time frame, connector, wire, if the number of screws and conform to the requirements of the screen (the screen for the P2.604 screen, 500 * 500 * 65 mm case 5 * 5 splicing), with 1 + 1.5 meters day 4 sets, connection piece of 32, connection screws 128, power cord article 75 cm25 between casing, line 75 cm25 article, three main power cord, two main lines, each of the main power cord with 8-10 boxes, each main line 8-10 boxes. 2, the screen body assembling, loading screen before each cabinet light test no problem in the jacket, the first row of first five cabinet with lock lock, and then the back every box fixed a time frame, 1.5 meters installed and where to use, the first row of the level, behind the connection plate and screws to fix box in time frame, and then the second row housing, around every cabinet lock, also use lock locking and lower enclosure, an analogy installed 3 row, then 1 m days out of 1.5 m days frame connection, in the above two rows of housing. 3. Wiring of the screen body, the power cord connection between the box body shall be inserted according to the wire and the symbol of the box body, and the network cable shall be similar. One main power cord and one main network cable shall be used in every two horizontal rows of the whole screen, and one main power cord and main network cable shall be used in the top row. 4. Power-on debugging: check whether the circuit of the screen body is connected wrong before power-on, confirm it is correct, then power on, connect the computer, make the screen body program on the computer, and then send it to the screen body. 5, the use of the screen, the specific content of the operation release please show the software use instructions.
ÉÏһƪ£º ÈÈÁÒ×£ºØÎÒÆóҵͨ¹ý¹ú¼Ò¸ßÐÂÆóÒµÈÏÖ¤
ÏÂһƪ£º ½ð±¦ÐÅÊÒÄÚP1.25È«²ÊÏÔʾÆÁÈÈÏúÖÐ
|